Serving Greater Lower Merion

Roof Replacement

Full roof replacements with new flashing, ventilation and decking where needed, permitted and itemized line by line.

Lower Merion Elite Roofing has completed roof replacement in Lower Merion, PA for more than 20 years, serving surrounding cities including Plymouth Township, Milford Township, Yeadon, Richland Township and West Norriton. We tear off and replace asphalt shingle, metal and flat roofs, and we restore or replace slate where the slate itself has worn out.

A new roof is a large purchase, so we treat it as one. Before we quote a replacement, we tell you honestly whether your roof could be repaired instead. When replacement is the right answer, the estimate itemizes the tear-off, decking, underlayment, flashing, ventilation and gutters separately, so you can compare our price with anyone else’s line by line.

Every replacement estimate is also checked against the permit rules where the house is. In Lower Merion Township that means the roofing addendum, which decides whether the job must be a full tear-off; in Narberth, Philadelphia and the surrounding townships it means each municipality’s own process.

Planning a Roof Replacement

The first course of new shingles nailed in at the drip edge on a full roof replacement in Roseglen, Lower Merion Township.

Permits, the Addendum and the Two-Layer Limit

Lower Merion requires a roofing permit and a roofing addendum for every re-roof. The addendum allows a maximum of two layers of shingles and forbids a new roof over slate, wood shake, clay, cement or asbestos-cement tile. We count the layers and identify what is under the shingles on the first visit, so if the law requires a tear-off, the estimate already includes it.

Historic Districts and Older Houses

In Lower Merion’s local historic districts, a roof replacement counts as an alteration under Chapter 88 and goes to the Historical Architectural Review Board for a Certificate of Appropriateness. We check the address before scheduling any work. For a house in a district, we plan the material choice and timeline around that review rather than starting a job that has to stop.

Solar Panels, Twins and Shared Roofs

If there are solar panels on the roof, we coordinate their removal and reinstallation as part of the project, not as an afterthought on the first day. On a twin, the new roof has to tie into the neighbor’s roof at the party wall, so we plan that seam carefully and let the neighbor know before work begins.

Choosing Materials for Your New Roof

Architectural Shingles

Most of the roofs we replace get architectural shingles, which are laminated for depth and much more wind resistance than old three-tab shingles. We install lines such as GAF Timberline HDZ, Owens Corning Duration and CertainTeed Landmark, each with its manufacturer’s starter strip, ridge cap and nailing pattern so the warranty stays valid. Look for wind ratings such as ASTM D3161 Class F or D7158 Class H and a UL 790 Class A fire rating.

Impact-Rated and Designer Shingles

Impact-rated shingles tested to UL 2218 Class 4 resist hail better and are a sensible upgrade on exposed roofs. Designer shingles imitate slate or cedar shake at a lower weight and cost than the real thing, which can suit a house whose neighbors have slate. We bring full-size samples so you can see them against your stone, brick or siding in daylight.

Metal and Low-Slope Sections

Many houses have a porch, bay or rear addition with a roof too shallow for shingles. During a replacement we roof those sections with materials suited to the pitch, such as standing seam metal, modified bitumen or a single-ply membrane, rather than stretching shingles onto a slope where they will leak.

What Goes Under the Shingles

Decking Inspection and Replacement

Once the old roofing is off, every sheet of decking is checked for rot, delamination and soft spots. Any damage is photographed and shown to you before it is replaced, and the price per sheet is already set in the contract. That way you are never asked to approve a surprise charge while the roof is open.

Ice Barrier and Synthetic Underlayment

We install self-adhering ice and water barrier meeting ASTM D1970 along the eaves, as IRC R905.1.2 calls for, and in valleys and around penetrations. The rest of the deck gets a synthetic underlayment meeting ASTM D8257, which lies flatter and resists tearing better than old felt paper.

New Flashing, Drip Edge and Ventilation

We replace step, counter and chimney flashing with every new roof rather than reusing old metal under new shingles. Drip edge goes on at the eaves and rakes, kick-out flashing at the base of sidewalls, and the ventilation is balanced, with soffit intake matched to ridge vent by net free area, so the new roof is not baked from below.

Estimates, Contracts and Paying for a New Roof

An Itemized Estimate You Can Compare

Our replacement estimates list the tear-off, decking allowance, ice barrier, underlayment, flashing, ventilation, shingles, gutters, permit and dumpster as separate lines. When a second contractor gives you a single lump sum, you can ask them to price the same items and see where the difference really comes from. Most of the time the cheaper bid has left out new flashing, ventilation or a realistic decking allowance.

What Your Contract Has to Say

Pennsylvania’s Home Improvement Consumer Protection Act requires a written contract with the contractor’s Attorney General registration number, a description of the work, the total price, the approximate start and completion dates, and notice of your right to cancel within three business days. Our replacement contracts include all of it, plus the per-sheet price for any decking that has to be replaced.

Why There Is No Sales Tax Line

In Pennsylvania, a contractor installing a roof pays sales tax when buying the materials, so the tax is already built into the price. You will not see a separate tax line on our estimate. If an estimate adds sales tax on top of the total for a roof replacement, it is worth asking why.

Insurance-Paid Replacements

When a storm has damaged the roof badly enough that your insurer is paying for a replacement, we work from the scope in your claim and point out anything the code or the township addendum requires that the scope missed, such as a forced tear-off or ice barrier. You file the claim and settle it with your insurer; we give you the photos and documentation and build the roof.

Help Paying for a Roof

Income-qualified homeowners in Lower Merion Township can apply to the township’s Housing Rehabilitation Program, which offers zero-percent deferred loans for repairs and names roofs among them. In Philadelphia, the Basic Systems Repair Program covers a roof only in narrow circumstances. We provide written scopes in whatever form a program asks for.

How a Replacement Day Runs

Protecting the House and Yard

Before the first shingle comes off, we cover shrubs, air-conditioning units and patios, and place the dumpster where the township’s dumpster permit allows. Gutters are protected so debris does not pile up in them during the tear-off.

Tear-Off and Dry-In

The crew tears off only as much roof as it can dry in the same day, so the house is never left open overnight. Decking repairs, ice barrier and underlayment go down immediately behind the tear-off, then flashing and shingles follow.

Daily Cleanup and Final Inspection

At the end of each day, the crew cleans the gutters, rakes the beds and runs a magnetic sweeper over the driveway, lawn and walkways to pick up nails. When the roof is finished, we walk it with you, pass the municipal inspection and give you the warranty paperwork.

  • 20+ Years Roofing
  • Itemized Written Scopes
  • Slate Repair Specialists

Good to know

Frequently Asked Questions

Can you put a new roof over my old one?

Sometimes, but rarely the best choice. Lower Merion's roofing addendum allows no more than two layers of shingles and no new roof over slate, wood shake or tile, and a second layer hides the decking and makes it impossible to replace the flashing properly. We tell you whether an overlay is legal on your house and why we usually recommend a tear-off anyway.

What happens if you find rotted decking?

We stop, photograph it and show you before replacing anything. The contract sets a price per sheet of decking ahead of time, so the cost of any replacement is already agreed and you only pay for the sheets that actually need it.

Do I need to be home during the roof replacement?

No, though we like to walk the house with you before the first day and after the last. Inside, it helps to take fragile items off walls on the top floor, because the hammering carries through the framing.

What warranty comes with a new roof?

Shingle manufacturers offer material warranties, and their enhanced warranties require the roof to be installed with their own matched components and to their instructions. We explain the options for the product you choose, along with our own workmanship warranty, in writing before you sign.

Can a roof be replaced in winter?

Yes, with some care. Shingles are less flexible in the cold and their sealant strips need warmth to bond, so winter installs may need hand-sealing. We schedule around snow and freezing rain and never leave a tear-off open overnight.

How much deposit will you ask for?

Pennsylvania's home improvement law caps the deposit on a contract over $5,000 at one-third of the price plus the cost of special-order materials. Our deposits stay within that limit, and the contract includes your three-business-day right to cancel.

Will you replace the gutters at the same time?

If they are worn, undersized or pitched badly, replacing them during the roof job is the cheapest time to do it, because the drip edge and fascia are already exposed. If they are sound, we protect them, clean them out at the end and leave them in place.

Ready to Get Started?

Request a free quote today and we'll get back to you fast.